The project  Overview

Olive Boreal was engaged by Goldbound Development. Project mangers for the scheme it was Oliver Boreal’s duty to control all aspects of the building construction.

The project

May 2006 saw the work commence on the development “Withington Point” the development that had been in the design process for some years. The Architect had pushed the envelope of design, creating an “iconic” building to the ,east entrance of Manchester.The superstructure was to proudly sit on a basement, designed for parking & access.

The Structural engineers Deakin Walton had design the underground structure to facilitate the maximum capacity of the site.

In September 2007 the project was complete,. The finished design  incorporated a profile roof.  Providing breath taking “contemporary” curved ceilings to the penthouses that followed the roof  line’s.